This project by Groupe Millet, a leading industrial carpentry company, forms part of an ambitious plan to significantly expand its warehouse near Bressuire, France. The structure of the new building with an area of 1,800 m² (19,375 ft²), called Extension M2, is primarily intended to enhance the company's operating capacities. GH Hervouet designed, manufactured, and assembled the steel frame, as well as the roofing and cladding components.
The building has a floor area of about 5,812 ft² and is intended for storage. The complex is divided into 10 different units, with common access from the inner courtyard, each equipped with a mezzanine for storing goods or equipment.
Within a short period of time, a modern aluminum structure with sophisticated building services was constructed for the company Hydro Aluminium in Grevenbroich.
The construction project on the premises near Düsseldorf covers approximately a length of 722 ft and a width of 394 ft. It includes various connecting bridges to the existing premises, a three-aisle production hall with outbuildings, and a 328-foot-long and 99-foot-high high-rack warehouse, which was constructed in slipform paving technology.